We are pleased to announce that ERH Communications Ltd has successfully migrated our Management System to the new ISO 45001:2018 Standard, demonstrating our ongoing commitment to achieving the highest standards of occupational health and safety whilst continually improving health and safety within
On 30th June (Eastbound) and 1st July (Westbound) the Brynglas Tunnel was closed for the purpose of maintenance activities. ERH managed the closure and all required maintenance activities including: Installation and testing of a 300kVA Generator, allowing power to be
ERH recently completed the A418 Corridor Improvement – ANPR installation for Ringway Jacobs and Transport for Buckinghamshire. The corridor improvement was part funded by NPIF (National Productivity Investment Fund) and the ANPR element formed part of a coordinated package of
ERH, with sister company Centregreat, undertook maintenance and improvement works on the Brynglas and Gibraltar (Monmouth) Tunnels – two critical elements of the South Wales transport infrastructure. The Gibraltar Tunnels are a pair of bored tunnels carrying the A40 through
We are pleased to have taken over Lots 1 & 4 of the Thames Valley Police (TVP) Framework, previously delivered by CA Traffic, covering the service elements associated with ANPR assets. We have worked and continue to work closely with
We are extremely pleased to be able to continue to serve the traveling public through the recent award of the Road Electrical and Technology Maintenance Contract 2018 for the South Wales Trunk Road Agent (SWTRA). The contract consists of category
ERH is proud to be part of the team that have delivered this award winning SuDS scheme to better manage rainwater in the Grangetown area of Cardiff. Using the latest techniques, this scheme catches, cleans and diverts rainwater directly into the
The ERH Communications team are busy on a plethora of Welsh Government schemes whilst also delivering for various police forces and private sector clients like Jenoptik. Current ASE (Average Speed Enforcement) schemes include: – Denbighsire where we constructed and installed
ERH are proud to be main contractor on the Greener Grangetown Project, a finalist in the Engineering Project of the Year at the Water Industry Awards 2018. Greener Grangetown is an innovative scheme to better manage rainwater in the Grangetown